The following check list summarizes the key items that are required for a final CAD Submittal. Consultants should review this check list and verify that final submittals meet these minimum requirements.
|
All drawing files have the correct Global Origin, Working Units, and Level Symbology. | |
|
File names conform to the District file naming conventions | |
|
All drawings use the District customized Font 2, and the correct font size. Most drawing text plots 1/10" high, with text width 80% of text height. | |
|
All abbreviations conform to the District's standard drawings for abbreviations. | |
|
Section and Detail titles and cross references conform to District standard as specified in the Engineering Standard Practice (ESP) 208.2. | |
|
Elements are drawn on the correct level, in accordance with the level application list. | |
|
A completed Reference File Documentation sheet is inside each file where reference files are used, and a hard copy is included in the submittal. | |
|
Named views were not used to attach any reference files. | |
|
A complete list of every file included in the submittal is provided on hard copy, with a brief (one line) description of each file. | |
|
All files are drawn at full size, with a plot scale that matches the predominate drawing scale. | |
|
The drawing borders are placed in each file, at the correct plot scale.. | |
|
The files do not contain shared cells, or any custom line styles that are not provided by the District. | |
|
Cells used in the drawings are from the District's cell libraries, and conform to the cell size and name as found in those libraries. | |
|
Additional Cells created by the consultant are included in the submittal in a cell library, and only include cells that were not available in the District's cell library. | |
|
Schematic drawings are drawn on the 1/8" and 1/16" grid, with all elements locked to the grid. | |
|
All elements in the files are drawn without color (CO=0) | |
|
The files do not contain elements or reference file attachments that are in conflict with the District's pen table and plotting parameters. | |
|
Final hard copy drawings are on mylar or vellum, as specified in the contract, and contain the file name and plot date in the lower left margin. |