Materials Transmitted to the Consultant or Developer
The District shall supply reference materials to the consultant or developer to aid in production of base drawings and design drawings. These materials will vary with each project, but may include the following:
project drawing number, usually a "W" number,
copy of the project's estimate sketch,
copy of the 250 scale Pipeline base map, and
copies of distribution system as built drawings that are associated with this project
As Built drawings and base maps, provided by the District, may not be up to date. Existing conditions should always be verified at the project site.