SUMMARY OF STANDARD LEVEL APPLICATIONS FOR PIPELINE DRAFTING
For a complete list of District Pipeline Drawing level assignments, click here. An EXCEL spreadsheet listing of all levels is provided in the DGNLIB folder with the Pipeline CAD software. Levels can also be viewed using Level Manager from within the design file. When the District's CAD software is properly installed on your system, you will automatically have all District levels available. Do not create any new levels.
The general categories (filters) of levels are:
Level Number |
Description |
101 thru 169 |
General levels, borders, notes, non-plot levels |
201 thru 208 |
boring holes, boring logs |
221 thru 224 |
Cathodic protection |
301 thru 386 |
Pipeline |
401 thru 415 |
Structural (used for Facility Drawings only) |
421 thru 436 |
Landscape and Irrigation (used for Facility Drawings only) |
441 thru 449 |
Mechanical (used for Facility Drawings only) |
451 thru 485 |
Architectural (used for Facility Drawings only) |
490 thru 498 |
Electrical (used for Facility Drawings only) |
1001 thru 1676 |
Civil (Survey and Site) |
1011 thru 1047 |
Controls and Alignments |
1051 thru 1065 |
Property |
1071 thru 1155 |
Topography and Profiles |
1201 thru 1287 |
Site |
1300 thru 1329 |
Miscellaneous (demolition, unidentified items) |
1401 thru 1676 |
Utilities |